Rail transport of imported solar photovoltaic modules

        In June this year, a customer entrusted our company to import a batch of goods from Germany, the name of the goods: solar photovoltaic modules. This year, the global COVID-19 outbreak has greatly affected international trade and transportation, with a large number of air outages, international express delivery, sea transportation and railway freight volume surging。

Rail transport of imported solar photovoltaic modules

I. Import process:

        The country of delivery of the customer's end user is Shaanxi. According to the customer's demand of delivery date and location, the final plan we gave was to arrange railway transport of the goods from Germany to Xi 'an Station by China-Europe railway。

        Due to the tight delivery time, we have confirmed with domestic and foreign customers the payment time, the preparation time of foreign shippers and the shift time of China-Europe train before operation, so as to shorten the time of import and export links as much as possible。For the international transportation of goods, our company recommends customers to apply for international transportation insurance, more than one safety, to avoid a series of losses caused by packaging, accidents and other factors in international transportation, such as damage to the goods, loss and other losses。

        After handling foreign exchange, confirm the scheduled train departure time and delivery time,Foreign confirmation of the goods immediately arrange container delivery and German export declaration procedures,Apply for international transport insurance before driving in Germany,Prepare relevant import documents and information before the goods arrive at the first port of entry in China,Handle China Customs and commodity inspection customs declaration, tax payment, inspection/release and other procedures on time。After the train arrives at Xi 'an Station, the goods will be picked up and delivered to the destination designated by the end user。
 

Ii. Remarks:

        Now the customs requires the customs clearance time, railway and sea goods need to complete the declaration and release procedures before the arrival of the goods at the port of destination, so customers must confirm the relevant documents of the import of goods in advance before preparing for import, to ensure the smooth import declaration, to avoid the goods after the arrival of the port found that the import of goods can not be imported normally under special supervision。


 

Link to this article: u42v.szyz88.net/product/jidianhuagong/442.html Rail transport of imported solar photovoltaic modules   
Reprint statement: This site publishes articles, for the original article reprint please indicate the source: Qiannuo International 


Telephone consultation
Public account

sweep
Thousand nuo wechat public number consultation

Back to top